BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Willow, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

The Matanuska-Susitna Borough is soliciting bids from qualified contractors to provide labor, equipment and material to construct a new fish passage culvert at an existing culvert crossing on Caswell Lakes Road at Caswell Creek near Caswell, Alaska. o Supply labor, supervision, equipment, materials and supplies to perform the required work as shown on construction documents for Matanuska-Susitna Borough (MSB) project number 17-15- 0484. o Contractor is required to obtain and maintain an ADEC APDES permit. o Contractor shall develop, implement and execute a Material Sampling and Testing Frequency plan and comply with the gravel mining permit requirements. o The Contractor shall develop, implement and execute a Traffic Control Plan which maintains access through the project while a road closure is not in place. Access for emergency vehicles must be maintained at all times. Work Zone speed limit associated with construction shall be a maximum of 20 miles per hour within project limits. o Normal work time will be between 7 a.m. and 7 p.m. Extensions will be considered and approved by the Borough's Representative. o Utility relocates are anticipated to be completed prior to the commencement of work. MEA will be removing the existing pole within the downstream channel and installing two new in-line poles to the east and west of the project area. MTA will be running aerial lines on the overhead span. o Time is of the essence. Notice to Proceed is anticipated for May of 2019. Work shall be performed in one continuous time period. Contractor shall complete the work no more than 60 Calendar Days after commencing operations. All work below the ordinary high water mark shall be completed by August 5, 2019. Substantial completion shall be achieved by August 15, 2019. Final completion shall be achieved by August 31, 2019. o Contractor shall follow and comply with all permit requirements. Permits are attached in section VIII or will be provided by addendum. o Estimated project magnitude is less than $600,000.

Award

Bridges / Tunnels

$464,460.00

Public - County

Paving, Site Work

25

1

4

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
95
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2019

May 1, 2019

img_map_placeholder

Caswell Creek Dr, Willow, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.