Published August 7, 2019 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving, renovation and addition to a mixed-use development in New Castle, Pennsylvania. Completed plans call for the addition of a stadium; for the demolition of a stadium; for the renovation of a stadium; for site work for a stadium; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project includes four (4) separate contracts described as follows: Contract 1A General Construction, Hess Ice Rink Addition & Renovations This project involves an addition to the existing Hess Ice Rink building enclosure to include a new entrance and renovations to the concession area, and a larger addition to house new locker rooms. Sitework will entail additional entrance drive and parking areas. The General Contractor will be responsible for General Construction, General Sitework, and coordination of the HVAC, Plumbing and Electrical prime contracts. Contract 1B HVAC Construction, Hess Ice Rink Addition & Renovations This project involves the HVAC work in the addition to the Hess Ice Rink building enclosure, and in the larger addition housing the new locker rooms. Contract 1C Plumbing Construction, Hess Ice Rink Addition & Renovations This project involves the Plumbing work in the addition to the Hess Ice Rink building enclosure, and in the larger addition housing the new locker rooms. It also includes storm water piping and catch basins in the parking areas. Contract 1D Electrical Construction, Hess Ice Rink Addition & Renovations This project involves the Electrical work in the addition to the Hess Ice Rink building enclosure, and in the larger addition housing the new locker rooms. It also includes site lighting on the exterior of the building and in the parking areas. Each Proposal shall be accompanied by cash, certified check, or Bidder's Bond in favor of Neshannock Township in an amount not less than ten percent (10%) of the amount of the Proposal, as evidence the Bidder will accept and carry out the conditions of the Contract in case of award.The Successful Bidder will be required to enter into a Contract with Neshannock Township, and to furnish a Performance Bond and Labor and Material Bond in the full amount of the Bid and Certificates of Insurance. No Bidder may withdraw their Bid within 60 days after the actual date of opening thereof. All Federal and State statutes, Laws and Regulations, which deal with the prevention of environmental pollution and preservation of public natural resources, must be adhered to in this project. The Successful Bidders will be required to comply with all Federal, State and local Laws and Regulations governing prevailing wage determination and fair employment practices which may be applicable to this Contract. Any questions regarding the Contract Documents can be directed to Todd Chamberlain, Claitman Engineering Associates, INC. Neshannock Township reserves the right to waive any informalities, or to reject any or all Bids. Bid Results: D.J. Hannon Plumbing  - Plumbing- $538,105 Giordano Construction Co. - General -$2,450,925 McCurley Houston Electric  -   Electrical- $252,500 Central Heating and Plumbing Co. - HVAC - $447,800

Award

Arenas / Stadiums

$3,689,330.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roofing and Siding Panels, Metal Wall Panels, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Openings, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Caissons, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Transformers, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Roadway Construction
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
143
Bidding Soon
1,325
All Active Projects
629
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2019

August 23, 2019

img_map_placeholder

3365 Mitchell Rd, New Castle, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hess Ice Arena Addition and Renovations - Contracts 1A, 1B, 1C, 1D

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.