BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2019 at 8:00 PM

Updated November 14, 2023

Demolition, site work, renovation and addition to an educational facility in Pflugerville, Texas. Completed plans call for the addition of a 30,000-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The project consists of approximately 30,000 sq ft new building addition on an existing campus. The project is steel framed construction, metal studs, brick, metal panels, and fiber cement board. Project includes full MEP, sitework including paving and landscaping. Interior finishes are metal stud walls, gyp bd, act ceiling, vct flooring and paint. The estimated approximate budget for bonding purposes is $4.5 M

Post-Bid

Educational

$4,500,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
129
Bidding Soon
2,759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2019

July 9, 2019

Project location map

1901 E Wells Branch Pkwy, Pflugerville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.