BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a mixed-use development in Saskatoon, Saskatchewan. Conceptual plans call for the construction of a 604,000-square-foot, three-story above grade, 15,900-seat stadium; and conference / convention center.

Construction of a new event and entertainment facility to be located on the Midtown shopping centre north parking lot, north of 22nd Street between 1st Ave. & Pacific Ave. The public realm areas encompass 22nd Street between Idylwyld Drive and 1st Avenue, a new plaza space directly south of the event centre in the southern half of the existing North Parking Lot for Midtown Plaza, a new courtyard area on the east side of the event centre and west of the Hilton Garden Inn, 23rd Street between roughly Wall Street and 1st Avenue, and a proposed future linear park running north along the east side of Ontario Avenue north of 23rd Street. The project is expected to be delivered via a Private Partner Procurement Approach. The Arena/Event Centre will be designed to host a variety of events and is expected to have a seating capacity of approx. 15,900. The layout incorporates a precast raker system seating bowl, along with two levels of public concourses and a premium level. Project will also include an expansion and renovation of the Convention Centre; construction of two levels of underground parkade beneath the Convention Centre with a total of 532 parking spaces; renovations to the Sid Buckwold Theatre; Utility upgrades; and a three-phased infrastructure improvement plan. TIMELINE: Planning work is ongoing. The City has approved a funding strategy and OVG360 (Oak View Group) is the recommended private Operating Partner for the long-term operations of the facility. Further project details and schedules may be confirmed by late 2024. *The total estimated cost of this project is $1,147,726,900. Estimated cost for the Arena/Event Centre is $632,069,400; the Convention Centre is $220,975,000; the Parkade is estimated at $74,998,900; and the Theatre renovation cost is estimated at $28,674,900. Hunden Strategic Partners have been engaged as the Deal Structure and Negotiations Advisor to assist with procurement of a private Operating Partner for the long-term operations of the facility.

Conceptual

Arenas / Stadiums

$1,147,726,900.00

Public - City

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
83
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

img_map_placeholder

Idylwyld Dr N & 22 St W, Saskatoon, SK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.