BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 7, 2022 at 8:00 PM

Updated September 15, 2023

Site work, paving and new construction of a mixed-use development in Freer, Texas. Completed plans call for the construction of a 47,000-square-foot military facility; pre-engineered storage facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and military facility.

The project objective is to design and construct facilities for a Border Patrol Station Complex in Freer, TX. It is Customs & Border Protection's (CBP) objective that these buildings will have a 25-year useful life before needing any major renovation, repair, or replacement. The Border Patrol anticipates occupying the building a minimum of 50 years. Therefore, the design and construction should provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project OWNER. The site infrastructure will have at least a 50-year life expectancy with industry-accepted maintenance and repair cycles

Post-Bid

Military

$100,000,000.00

Public - Federal

LEED Certification, New Construction, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
23
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

September 27, 2022

Project location map

US-59, Freer, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.