Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Brunswick, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The work is site development of the Altama Elementary School. Work includes earthwork, grading, storm drainage, site water, site sanitary sewer, and maintenance of existing erosion control and installation and maintenance of additional erosion control. The initial phase of the work will include establishing building pads, installing basic storm drainage, site water system (site water to be extended to a location near the building to be available for construction use), a portion of sanitary sewer system. The intent is to have a completed building pad and site ready for occupation of the building contractor by July 31, 2019. The competitive sealed proposals will be received and evaluated in accordance with the State of Georgia Code Section 36-91-21G, paragraph (c) as follows: "(c) (1) In making any competitive sealed proposal, a governmental entity shall: (A) Publicly advertise a request for proposals, which request shall include conceptual program information in the request for proposals describing the requested services in a level of detail appropriate to the project delivery method selected for the project, as well as the relative importance of evaluation factors; (B) Open all proposals received at the time and place designated in the request for proposals so as to avoid disclosure of contents to competing offerors during the process of negotiations; and (C) Make and award to the responsible and responsive offeror whose proposal is determined in writing to be the most advantageous to the governmental entity, taking into consideration the evaluation factors set forth in the request for proposals.The evaluation factors shall be the basis on which the award decision is made. The contract file shall indicate the basis on which the award is made. (2) As set forth in the request for proposal, offerors submitting proposals may be afforded an opportunity for discussion, negotiation, and revision of proposals. Discussion, negotiation, and revisions may be permitted after submission of proposals and prior to award for the purpose of obtaining best and final offers. In accordance with the request for proposals, all responsible offerors found by the governmental entity to have submitted proposals reasonably susceptible of being selected for award shall be given an opportunity to participate in such discussions, negotiations, and revisions. During the process of discussion, negotiation, and revision, the governmental agency shall not disclose the contents of proposals to competing offerors." The following evaluation factors and weights will be used to rate each proposal. The rating committee or their appointed agent will: (1) review all proposals and identify the proposals of responsible offerors reasonably susceptible of being selected for award; (2) send written notice to each firm not judged "reasonably susceptible of being selected for award", notifying them of the reason or reasons the proposal is not being further evaluated; (3) After careful review of the proposal and supporting information, assign a rating from 1 to 10 for each factor and then multiply the factor weight by the rating to determine the numerical value of each factor. The numerical value of the evaluation factors will be totaled to achieve the total rating of each Proposal.1. Cost Proposal. 40% of total 2. Experience in completing similar projects in the past 3 years. 30% of total 3. Demonstrated Ability to meet the project schedule. 20% of total 4. Participation by local contractors, subcontractors and suppliers. The Owner reserves the right to reject any and all proposals and to waive technicalities and formalities, and to award the contract in the best interest of the Owner. The Owner will evaluate each proposal and make a final rating of the evaluation factors and make a contract award decision prior to disclosing the contents of the proposals. The contract award will be made by the Owner based on the evaluation factors. The factors are as follows: 1.Cost Proposal. The Owner will rate the cost proposals numerically. Those that are within the Owner's budget will be evaluated in accordance with the selection criteria. Those that exceed the Owner's budget may be judged, "not reasonably susceptible of being selected for award" and may not be evaluated further. If during the evaluation of cost proposals, errors are found or questions arise relative to the ability of the Contractor to profitably complete the job, a relatively low cost proposal may receive a low score rather than a high score. Otherwise, the lowest cost proposal will receive the highest rating and the highest cost the lowest rating. 2.Experience in completing similar projects in the past three (3) years. Please prepare a list of at least three (3) similar projects completed in the last three years for a governmental agency (State of Georgia agencies, or cities, counties or Boards of Education in the state of Georgia). If team does not have this specific experience, list three (3) most similar projects. Proposed construction team is hereby defined as the contractor who submits the proposal and subcontractors. The project team also includes project manager and on-site superintendent of the contractor. The proposal form includes a list of the project team for guidance. Failure of the proposer to demonstrate project team experience on three (3) similar projects may result in the proposer being judged "not reasonably susceptible of being selected for award". Please include the name of the project, name, telephone number, fax number and e-mail of the representative of the architect or engineer in charge of construction contract administration; and name, telephone number, fax number and e-mail of the representative of the Owner.Also include a general description of the work performed and the cost of each project. The owner's selection committee will contact references, and the report of the references relative to their experience with each proposer, will be the most important factor in establishing the final rating of each proposer. 3. Demonstrated Ability to meet project schedule. As part of the "Demonstrated Ability to meet this Project Schedule" the proposers should include a detailed Project Schedule which clearly shows the steps necessary to accomplish the substantial completion on schedule. This schedule should accompany the Proposal form. Substantial completion is to be achieved per the project schedule published as a part of the proposal documents. 4. Participation by local suppliers, subcontractors, laborers and tradesmen. The Owner is seeking maximum participation of local suppliers, subcontractors, laborers and tradesmen. As set forth on the proposal form, submit a list of all suppliers, subcontractors, laborers and tradesmen that you propose to use who are residents of Glynn County or who have had a business license in Glynn County or the City of Brunswick for at least three (3) consecutive calendar years. In addition, submit a list of the local suppliers and subcontractors from whom you received quotations for the project and the amount of their quotations as compared to other competing quotations for the work. During the negotiations, we will calculate the dollar value of the labor, materials, subcontracts and services to be purchased in Glynn County. A rating of 10 will be given to the firm proposing the largest dollar value of Glynn County purchases. A rating of 0 will be given as the point of beginning for no Glynn County purchases. Ratings between 0 and 10 will be given to firms proposing some Glynn County purchases prorated from 0 to 10 based on the relative value of Glynn County purchases as compared to other proposers. Please direct all questions to Mr. Larry Rountree of John A. Tuten & Assoc., Architects, via email at larryr@johntuten.com.
Award
Roads / Highways
$1,587,854.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
May 2, 2019
May 16, 2019
July 31, 2019
5505 Altama Ave, Brunswick, GA
Related To This Project
Brunswick, GA
Bid Date: Oct 16 2024
Brunswick, GA
Bid Date: Jun 02 2020
Brunswick, GA
Bid Date: Dec 03 2020
Brunswick, GA
Bid Date: Jun 12 2020
Brunswick, GA
Bid Date: Jun 19 2019
Brunswick, GA
Bid Date: May 30 2019
Brunswick, GA
Bid Date: Jul 26 2019
Brunswick, GA
Bid Date: Oct 07 2020
Brunswick, GA
Bid Date: Jul 21 2021
Brunswick, GA
Bid Date: Oct 27 2021
Brunswick, GA
Bid Date: Jun 15 2021
Brunswick, GA
Bid Date: Jul 16 2021
Brunswick, GA
Bid Date: Jul 23 2021
Brunswick, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--