Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2022 at 7:00 PM
Updated November 15, 2023
Site work, paving and renovation of a bridge / tunnel in Eminence, Missouri. Conceptual plans call for the renovation of a bridge / tunnel; for paving for a bridge / tunnel; and for site work for a bridge / tunnel.
As of January 27, 2022, an engineer has been selected for the project. The environmental assessment stage is underway. Per the owner, J0420 is scheduled for replacement in 2026. The owner states that G0804 is not scheduled at this time but is anticipated for 2028 or 2029.. The owner also states that no design team or general contractors have been selected at this time as they are still going through the NEPA process which is planned to be completed by the end of 2022. Closed solicitation has been included below for reference. .............. Location: Route 19 at Current River and Spring Valley Proposed Improvements: Bridge Improvements for J0420 and G0804 Length : As needed to study J0420 and G0804 Consultant Services Required: Environmental Assessment (EA) and Finding of No Significant impact (FONSI). See following page for general scope of services required. The method of contractor selection has not been determined at this time. "Request for proposals for Consultant services is underway" MODOT- RFQ - Bridge Improvements for J0420 and G0804
Conceptual
Bridges / Tunnels
$18,000,000.00
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
MO-19, Eminence, MO
Related To This Project
Eminence, MO
--
Eminence, MO
Bid Date: May 17 2024
Eminence, MO
Bid Date: Aug 01 2024
Eminence, MO
Bid Date: Aug 13 2024
Eminence, MO
Bid Date: Oct 28 2024
Eminence, MO
Bid Date: Mar 03 2025
Eminence, MO
Bid Date: May 28 2024
Eminence, MO
Bid Date: Jun 20 2023
Eminence, MO
Bid Date: May 18 2023
Eminence, MO
Bid Date: Apr 12 2023
Eminence, MO
Bid Date: Jul 13 2022
Eminence, MO
Bid Date: Dec 21 2022
Warsaw, MO
Bid Date: Jan 20 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
