BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

This is a service / maintenance or supply contract in Eminence, Missouri. Contact the soliciting agency for additional information.

Job No: J9P3814 Location: 5.3 miles north of Route D at Spring Valley Proposed Improvement: This project replaces Bridge No. J0420 over Spring Valley in Shannon County, widening, intersection improvements, add center turn lane, and access management along corridor. Length: 0,5 miles DBE Goal Determination: 5% Surveying: MoDOT to provide all LIDAR survey mapping and deed writing. Consultant will provide land corners, property lines, staking for right of way, monument new right of way and prepare boundary surveys. MODOT - RFQ - Route 19 - Widening, Intersection Improvements, Add Center Turn Lane, and Access Management Along Corridor

Conceptual

Bridges / Tunnels

$9,160,000.00

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
9
Bidding Soon
334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.