BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a golf course in Oacoma, South Dakota. Completed plans call for the renovation of a golf course; and for site work for a golf course.

**Documents are for reference only. Register directly through Gill Design Inc. if you are interested in the project. The Project includes completion of golf course renovation improvements as described in the plans and specifications for the Project known as 2019 Golf Improvement Project, Chamberlain Country Club.The Work can generally be described to include construction shaping and finishing of golf course features including greens, tees, fairways and roughs, installation of HDPE irrigation piping, sprinkler heads, wire and controls and site restoration work inclusive of seeding, fertilizing and hydro-mulching. It is expected that all bidders have sufficient experience and expertise in acceptable golf course construction methods and that they are familiar with the specific project site, working conditions, and time in which the project must be completed. The Work to be performed under this contract shall be substantially completed on or before August 31, 2019 with final completion on or before September 30, 2019. No work to commence before April 29, 2019. A Bid Bond is required. If submitted by certified check or cashier's check, it is 5% of the bid. If submitted as a bid bond, it is 10% of the bid. A Payment and Performance Bond is required. The Performance Bond shall be in the amount equal to the bid. The Successful Bidder shall be responsible for providing evidence or affidavits of payment for labor and installation for which previous payments are made and to provide insurance of the types and amounts as required by the City of Chamberlain. The right is reserved to reject any or all bids, or any part of the bid, or to accept a bidder other than the lowest in case it seems advisable to said Project Manager to do so. No bidder may withdraw his bid within thirty (30) days after the actual date of opening thereof. By virtue of statutory authority, preference may be given to bidders residing within the State of South Dakota. The Chamberlain Country Club Board, City of Chamberlain, South Dakota does not discriminate on the basis of race, color, national origin, sex, religion, age, or disability in employment or the provision of services.

Award

Golf Course

$273,900.00

Public - City

Renovation, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
7
Bidding Soon
54
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2019

May 20, 2019

img_map_placeholder

117 Nevada Ln, Oacoma, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.