BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2022 at 8:00 PM

Updated January 25, 2024

Demolition, site work, paving and new construction of an educational facility in Columbia, Missouri. Completed plans call for the demolition of a educational facility; and for the construction of a educational facility.

The board approved a $30 million project to replace the Sinclair School of Nursing building, built in 1979. The project will demolish the existing building and build a smaller three-story building over the existing basement. Funding will include $12 million from Sinclair School of Nursing reserve funds, $10 million from private donations and land sales at Sinclair Farm and $8 million from MU Health Care.

Occupancy

Educational

$16,381,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
43
Bidding Soon
488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2020

April 1, 2020

Project location map

To Be Determined, Columbia, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.