Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 18, 2023 at 8:00 PM
Updated October 1, 2024
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Philadelphia, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and for outdoor lighting for a road / highway.
ITEM 9000-0003 This project includes 5 major components: (1) Replacing and expanding the existing cap/bridge structure near Penn's Landing and constructing a new, extended cap/bridge structure which will span both I-95 and Christopher Columbus Boulevard between Chestnut and Walnut Streets for pedestrian and vehicular use (Note the current cap extends from Chestnut Street to Sansom Walk, and only Chestnut Street and Walnut Street span Columbus Boulevard) (2) Extending the South Street pedestrian bridge from the east edge of I-95 northbound over Columbus Boulevard to Penn's Landing (3) Reconstructing the viaduct connection between Chestnut and Market Streets at Penn's Landing (4) Constructing a section of the Delaware River Trail along Christopher Columbus Boulevard and (5) Inspection and repairs of underwater concrete piles located in the Penn's Landing area and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 95, SECTION CAP in PHILADELPHIA COUNTY in City of Philadelphia from approximately Station 479+00 to Station 239+50 from segment 0180 offset 0203 to segment 0210 offset 2128 and from approximately segment 0181 offset 0183 to segment 0211 offset 2114. Project Cost Range: $225,000,000.00 - $249,999,999.99 Federal Project Status: Federal Oversight Structure Work: 54.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 PennDOT - Central Access Philadelphia Project, Design Activities:Bridge, Retaining Walls and Highway Lighting. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Under Construction
Bridges / Tunnels
$328,905,707.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2022
April 3, 2023

I-95, Philadelphia, PA
Related To This Project
Philadelphia, PA
Bid Date: Nov 14 2022
Philadelphia, PA
Bid Date: Nov 18 2022
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Oct 31 2022
Philadelphia, PA
Bid Date: Dec 09 2022
Philadelphia, PA
--
Philadelphia, PA
--
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Oct 27 2022
Philadelphia, PA
Bid Date: Oct 24 2022
Philadelphia, PA
Bid Date: Oct 05 2022
Philadelphia, PA
Bid Date: Sep 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Central Access Philadelphia Project, Design Activities:Bridge, Retaining Walls and Highway Lighting
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.