BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a civil project in Philadelphia, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and for outdoor lighting for a road / highway.

ITEM 9000-0003 This project includes 5 major components: (1) Replacing and expanding the existing cap/bridge structure near Penn's Landing and constructing a new, extended cap/bridge structure which will span both I-95 and Christopher Columbus Boulevard between Chestnut and Walnut Streets for pedestrian and vehicular use (Note the current cap extends from Chestnut Street to Sansom Walk, and only Chestnut Street and Walnut Street span Columbus Boulevard) (2) Extending the South Street pedestrian bridge from the east edge of I-95 northbound over Columbus Boulevard to Penn's Landing (3) Reconstructing the viaduct connection between Chestnut and Market Streets at Penn's Landing (4) Constructing a section of the Delaware River Trail along Christopher Columbus Boulevard and (5) Inspection and repairs of underwater concrete piles located in the Penn's Landing area and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 95, SECTION CAP in PHILADELPHIA COUNTY in City of Philadelphia from approximately Station 479+00 to Station 239+50 from segment 0180 offset 0203 to segment 0210 offset 2128 and from approximately segment 0181 offset 0183 to segment 0211 offset 2114. Project Cost Range: $225,000,000.00 - $249,999,999.99 Federal Project Status: Federal Oversight Structure Work: 54.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 PennDOT - Central Access Philadelphia Project, Design Activities:Bridge, Retaining Walls and Highway Lighting. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Under Construction

Bridges / Tunnels

$328,905,707.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

2225

25

835

4

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
201
Bidding Soon
3,684
All Active Projects
1,740
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

April 3, 2023

img_map_placeholder

I-95, Philadelphia, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.