BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Diego, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work to be Done consists in general of asphalt concrete overlay, pavement milling and cold in place recycling. The project will also include, but not limited to pavement remediation, traffic delineation, curb ramp retrofitting, minor concrete work, and video detection system installation. The project is located in the vicinity of various locations in Supervisorial Districts 1, 2 and 5, in the County of San Diego, State of California. Late submission cannot be considered unless there was mishandling on the part of the County of San Diego purchasing staff. Submittals must be received at the Purchasing and Contracting front counter by the identified date and time. If utilizing a courier service or USPS, be advised that all courier service deliveries, including USPS, might be delivered to the County's central mail room, which may result in late submission and rejection of your bid. The Contractor shall possess, at the time of submitting the bid, a California contractor's license, Classification A, General Engineering Contractor, or Classification C-12, Earthwork and Paving Contractor. In accordance with Board of Supervisors Policy "B-39a", a Disabled Veterans Business Enterprise (DVBE) participation of three percent (3%) is required for a public work project that is estimated (by the County) to exceed $1 million. A good faith effort cannot be accepted in lieu of meeting the 3% requirement. Should the lowest prime contractor not meet the 3% requirement, the next lowest responsible and responsive bidder that complies with the DVBE requirement will be awarded the contract. For a public work project that is estimated (by the County) to be between $500,000 and $1 million, all bidders are required to make a good faith effort to meet-or-exceed a 3% DVBE subcontractor participation. The Good Faith Effort shall be documented demonstrating all participation was obtained prior to bid submittal. For a public work project estimated (by the County) to be less than $500,000, DVBE participation is encouraged, but not required. DVBE participation may be documented on page 2-10, but is not required at this estimate level. The County's estimate for this public work project is from $3,800,000 to $4,000,000 for Total Bid (Base Bid plus Additive Alternates 1 and 2 Bid Schedules). Bid Security in the form of cash, or a certified or cashier's check, or a Bidder's Bond for at least ten percent of the bid amount executed by a corporation duly authorized to issue bonds in the State of California shall accompany the bid. Performance and Payment Bonds: The successful bidder will be required to furnish a Performance Bond for one hundred percent, and a Payment Bond for one hundred percent of the Contract amount. State Prevailing Wage Rates: This project is a "public work" in accordance with Labor Code 1720, et seq. It is the sole responsibility of the Contractor to ensure that all workers employed in the execution of the contract are paid the correct prevailing wage rate of wages. The Board reserves the right to reject any or all bids and to waive any informality or irregularity in the bids or bidding.

Award

Roads / Highways

$3,352,038.00

Public - County

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
110
Bidding Soon
1,443
All Active Projects
703
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 23, 2019

July 22, 2019

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.