BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Corpus Christi, Texas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Beach Avenue is the northern most interchange road onto U.S. HWY 181. It is a two-way, two lane road bounded by E. Causeway Boulevard and the dead end beyond Gulf Breeze Boulevard. It is recommended this project include reconstruction of an existing two-lane roadway including storm water drainage, wastewater, and water utilities be updated, and curb & gutter, sidewalk, and roadway be reconstructed. The improvements to Beach Avenue will need to be coordinated with the improvements planned by the City under the North Beach Access Management Initiative Project. The proposed improvements for this project will include a three-lane roadway from E. Causeway Boulevard to Timon Boulevard and a two-lane roadway extending from Timon to the existing park at the eastern end of Beach Avenue. The project includes 5' ADA sidewalks, consistent with the C-1 Collector designation in the Urban Transportation Plan. The project includes pavement restoration, upgraded signage, pavement markings, ADA ramps, water, wastewater, and gas utility improvements, and storm water improvements as necessary. Due to the new TXDOT Harbor Bridge future increases to the traffic flow should be taken into consideration by performing a detailed traffic analysis during the preliminary design to forecast the proposed traffic increase. The project is included in the city's 2023-2025 capital improvement plan (CIP). As of December 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$734,753.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
208
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

img_map_placeholder

Beach Ave, Corpus Christi, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.