BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Thornton, Colorado. Conceptual plans call for site work for a water / sewer project.

As of December 1, 2022, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Thornton is seeking proposals for a Consultant to assist in developing a community-supported site master plan for the Aylor Open Lands, an undeveloped, city-owned 139-acre parcel zoned Park/Open Space (POS) in the northeast portion of Thornton. It is generally located north of 136th Avenue between Monaco Street and Quebec Street as shown in Attachment A. The site contains existing structures remaining from a home, barn, farm equipment, scraps, irrigation ditch, oil and gas wells and an existing cell tower. The site master planning effort will engage representatives from the Anythink Library District, who are considering the location for a future library site. The master plan will integrate the potential 10 to 15 acre library site with industry-leading active and passive uses on the balance of the property to develop a regional destination. The master plan will incorporate innovative, place-making ideas for a well-connected and inclusive active and passive recreational/educational area for all ages. Thornton desires to leverage the library site with the natural assets of the Aylor property, including unique elevation changes, view corridors (mountains, plains, and Denver), water features, wildlife habitat, riparian ecosystems, and educational opportunities. The master plan will identify off-site infrastructure improvements such as water, sewer, stormwater, communications and transportation needs as well as recommend mitigation actions for existing onsite telecommunication and oil and gas facilities. The master plan will take into consideration integration with existing and future residential development adjacent to the property, noise, lighting, site access, traffic, soils, maintenance and other factors. The Project will include some level of public participation in the development and support of the plan. The Consultant will provide two (2) conceptual sketch master plan alternatives including cost estimates and proposed phasing plan for review and comment prior to finalizing the plan. Piggyback Contract: No Question Acceptance Deadline: 05/17/2019 07:00 PM EDT Questions Are Submitted Online: No

Conceptual

Water / Sewer

$4,467,000.00

Public - City

Site Work

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
61
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.