Published March 16, 2022 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Altoona, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project is for the removal and replacement of two existing structures on SR's 4013 & 4015 in Blair County. The existing Single Span Steel I-Beam Bridge which carries SR 4013 over Homers Gap Run will be replaced with Single Span Composite Prestressed Concrete Spread Box Beam Bridge. The existing Reinforced T-Beam Bridge which carries SR 4015 over Spring Run will be replaced with a 23'-0" x 8'-0" Precast Reinforced Concrete Box Culvert. The proposed work is for the replacement of both structures including roadway approach work, drainage, guide rail upgrades, waterline relocation on SR 4015 and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4015, SECTION 01B, in BLAIR COUNTY, LOGAN TOWNSHIP, CITY OF ALTOONA at the locations indicated on the plans in the bid package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 56.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-3 All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - Wopsononock Avenue Spring

Award

Bridges / Tunnels

$2,235,298.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Equipment, Water Service Connections
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Machining Equipment, Boring Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
58
Bidding Soon
535
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

April 4, 2022

img_map_placeholder

State Rte 4015, Altoona, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wopsononock Avenue Spring

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.