BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2020 at 7:00 PM

Updated February 5, 2026

Site work for a transportation facility in Saint Louis, Missouri. Completed plans call for site work for a runway / taxiway.

As of January 23, 2020, this project was Railworks Track Services, Inc., also low bidder $840,232. Notice to proceed was 1/14/2020. GENERAL DESCRIPTION The Contractor shall furnish engineering, design, labor, material, tools, equipment, and construction services necessary to provide total PROJECT SCOPE OF WORK AS HEREIN DESCRIBED. 1.2 OCCUPANCY The Contractor shall allow the Owner to take possession of and use any completed or partially completed portion ofthe facility during the progress ofthe Work as is possible without interfering with the progress ofthe Contractor. Possession and use ofthe facility shall not in any way evidence the completion ofthe Work or signify the Owner's acceptance ofthe Work or any part ofit. 1.3 NUMBER OF SPECIFIED ITEMS REQUIRED Wherever in these Specifications an article, device or piece of equipment is referred to in the singular number; such reference shall apply to as many such articles as are shown on the Drawings or required to complete the Work. 1.4 DRAWINGS FURNISHED BY THE OWNER The following Drawings and/or Exhibits (see list at the end of'Index of Specifications'), furnished by the Owner, shall be considered as part of and illustrating these Specifications. The Specifications are intended to supplement the drawings, the two being considered cooperative. The Drawings show the general character ofthe Work, but the Owner may furnish large-scale detail Drawings ofsuch portions, as in itsjudgment may be required, in the preparation of which slight modifications may be made in minor details of design, if necessary. The Contractor shall not execute any work requiring such large-size details until same has been approved and all work must be made in strict accordance with such detail Drawings. Dimensions on Drawings take precedence over measurements by scale, detail Drawings over small-scale Drawings, and full-size details over all other Drawings. The decision ofthe Owner shall be final as to the interpretations of Drawings and Specifications. The Contractor and its Sureties shall be liable for and shall pay to the Authority five thousand dollars ($5,000.00) as fixed, agreed and liquidated damages for each calendar day of delay from the completion date established in the Notice to Proceed, as is determined by the above Time for Completion, or as modified in accordance with Section 9, Changes in the Work in the Project Conditions until such work is satisfactorily completed and accepted (final completion). Substantial completion/beneficial occupancy shall not alleviate the Contractor’s liability for liquidated damages.

Under Construction

Transportation Terminals

$840,232.00

Public - City

Site Work

14

12

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
3
Bidding Soon
999
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2019

January 14, 2020

Project location map

14 N Market St, Saint Louis, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.