BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2019 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Arlington, Massachusetts. Completed plans call for site work for a water / sewer project.

Phase #11 Sanitary Sewer Rehabilitations. The scope of work includes approx: 50 lin ft of open cut point repairs of sanitary sewers; chimney replacement with building connections; replace service wye; 1,500 lin ft root treatment; 7,500 lin ft of CIPP; grout 150 service connections; cut 16 protruding service connections; grout and seal of 280 vt ft manholes; grout and patch 7 manholes; 2 manhole inflow dish; replace 2 manhole frame and cover; raise 3 manhole frames and covers; build 2 manhole benches and inverts; enclose storm drain; replace 2 PVC caps; 8100 lin ft of post-construction flow isolation; 604 lin ft clean, inspect, test and seal sewers; CIP short liners; CIP lateral liners;

Award

Water / Sewer

$461,660.00

Public - City

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
573
Active Projects
270
Bidding Soon
3,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2019

July 8, 2019

Project location map

To Be Determined, Arlington, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.