BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2019 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Arlington, Texas. Completed plans call for the renovation of a water / sewer project.

**As of 9/4/2019 Project has no awards yet no time frame A. The work governed by these specifications is located in the City of Arlington, Texas and consists of Sanitary Sewer Lift Station Improvements, City of Arlington Project No. WUTR14010, including all necessary appurtenances. B. The Contractor shall provide, at his own expense, all construction staking required to perform the work as described in the plans and specifications. For City capital projects, control monuments may be verified by the City. The Contractor shall set excavation and fill stakes on or near the right-of-way, all stakes necessary for water or sewer relocation and storm drain placement, 4-feet off-set back of curb stakes for subgrade stabilization and paving, and intermediate grade stakes (i.e. blue topping, fill, or cutstakes) on the centerline. All staking shall be subjected to inspection by the City. While the City shall have the right to inspect, it shall have no duty to inspect. The Contractor will be responsible for any discrepancies from the plan alignment and/or grade. Calendar days will not be adjusted due to the lack of available crews or due to the negligence of the Contractor or vandalism that causes the replacement of stakes. C. Work shall be accomplished between the hours of 7 a.m. to 6 p.m. (Central Standard Time) and 7 a.m. to 8 p.m. (Central Daylight Savings Time), Monday through Friday unless otherwise approved by the City. For Saturday and holiday inspections, see Section 11-22. D. Contractor is responsible to stay informed of all events involving the AT&T (Cowboys) Stadium, Globe Life Park (Texas Rangers) and any other major events at other venues in the Entertainment District. Contractor shall not work in the Entertainment District unless approved by the City’s Traffic Engineering division. Upon approval to proceed with construction, the Contractor must complete work and remove all traffic control devices two (2) days prior to the next event, or as directed by the City. It will be the responsibility of the Prime Contractor to see that Subcontractor(s) is in compliance with requirement. Sealed Bid for WUTR14010 Sanitary Sewer Lift Station Improvements

Award

Water / Sewer

$985,760.00

Public - City

Renovation

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
140
Bidding Soon
4,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2019

September 9, 2019

Project location map

1901 Lakewood Dr, Arlington, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.