BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2020 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Arlington, Texas. Completed plans call for site work for a water / sewer project.

Proposed Start Date: October 2020 Proposed End Date: August 2021 This project primarily consists of the rehabilitation of an existing 66" reinforced concrete pipe (RCP) sanitary sewer main via sliplining with new 60-inch fiberglass reinforced pipe (FRP), as well as improvements to the Bob Findlay Linear Park trail. All bidders and subcontractors on this project must be pre-qualified in the appropriate work category as outlined in the Instructions to Bidders of the contract documents. A cashier's check or an acceptable Bidder's Bond payable to the City of Arlington, Texas, in an amount of not less than five percent (5%) of the largest possible total for the bid submitted, must accompany the bid. A Performance Bond and a Payment Bond, each for one hundred percent (100%) of the contract price, will be required. The successful bidder shall also furnish to the City a Maintenance Bond covering defects of material and workmanship for two calendar years following the City's approval and acceptance of the construction. Not less than the prevailing wage rates adopted by the City of Arlington, Texas, and as set forth in the contract documents, must be paid on this project. The City reserves the right to request bidders to provide Minority/Women Business Enterprises (MWBE) information. This is for information only and no preference shall be given nor will this information affect the results of the contract award. In case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to accept the most advantageous construction thereof to the City or to reject the proposal. The City reserves the right to reject any or all bids and waive any or all informalities. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. All inquiries must be submitted to the City no later than seven (7) calendar days prior to bid opening as outlined in the Instructions to Bidders of the contract documents. A Pre-Bid Meeting will NOT be held for this project. All questions and comments MUST be emailed to the project engineer, Emily Hannon at emily.hannon@arlingtontx.gov. Answers to questions/comments will be addressed via addendum(s). Please submit question and comments as soon as possible to allow ample time for responses and multiple addendums, if necessary. Questions/comments received three (3) business days or less prior to bid opening may not be entertained. MBE : 19.44% WBE :9.17%

Award

Water / Sewer

$1,957,019.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2020

October 5, 2020

Project location map

Multiple Locations, Arlington, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.