BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Akron, Ohio. Completed plans call for site work for a water / sewer project.

The project consists of cured in place pipe lining of 2822 linear feet of sanitary sewer and 928 linear feet of storm sewer. It will also consist of construction of 361 linear feet of 8 inch sanitary sewer along Maplewood Avenue. Manhole replacement, reconstruction and rehabilitation will also occur throughout the project limits. Those documents can also be viewed in the office of the Bureau of Engineering, 7th Floor Municipal Building, Akron, Ohio. Plans are in accordance with the City of Akron, Construction and Material Specifications, 2008 Edition and with the City's standard construction drawings, unless otherwise noted in the plans or the bid book. Copies of these specifications and drawings may be purchased at the same location as listed above.Standard Drawings may be purchased from SE Blueprint, Inc. at a cost of $6.00. Purchases are not refundable. These documents are also available at no charge on the City of Akron website. Copies of Section 153.011 of the Ohio Revised Code can be obtained from the Ohio Department of Administrative Services. Except as provided in Section 102.07 of the City of Akron, Construction and Materials Specifications, 2008 Edition, each proposal must be accompanied by a certified check in the sum of 5% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City of Akron, as a guarantee, that if the proposal is accepted, a contract will be entered into. Proposals may be held by City for a period not to exceed one hundred twenty (120) days after the date Proposals are opened for the purpose of reviewing the Proposals and investigating the qualifications of Proposers prior to awarding the Agreement. Except as provided in Section 34.09 of the City's Code of Ordinance, the Proposer to whom the Agreement is awarded will be required to furnish a performance and payment bond in the sum of 100% of the Contract Price for the faithful performance of the contract. The performance and payment bond shall remain in full effect until Final Completion of the Project. The Director of Public Service reserves the right to reject any or all bids, and to waive informalities.

Post-Bid

Water / Sewer

$602,871.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
63
Bidding Soon
955
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2019

July 17, 2019

img_map_placeholder

Mayfield Ave & Maplewood Ave, Akron, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.