BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2019 at 8:00 PM

Updated April 18, 2025

Site work and renovation of a municipal facility in Toledo, Ohio. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

The Division of Solid Waste is requesting bids to replace the pit truck scale deck at the Hoffman Road Landfill. The concrete scale deck is beginning to deteriorate and needs replaced. The contractor selected will be responsible for all activities associated with the scale deck replacement.Successful bidders will provide a schedule and cost for the services outlined below:1. Demolition of existing scale deck.The contractor selected will be responsible for all demolition and removal activities for the existing scale deck. The scale deck is constructed over a pit. It should be assumed that broken up concrete and rebar will be disposed on-site with no disposal fees. The contractor will be responsible for all loading and transporting of broken up material from the scale deck location at the Hoffman Road Landfill to the location of disposal at the Hoffman Road Landfill. The cost should include all crane and rigging fees, as applicable. 2. Installation of new concrete scale deck. The contractor will be responsible for the installation of the new concrete scale deck. The replacement scale deck is required to meet the same specifications of the existing scale deck and include two manholes for access. The cost should include all labor, parts, and materials, including hydrostatic load cell positioning. During replacement relevant scale deck components should be inspected including bumper bolts, plates, and load cells. If needed, recommended repairs or replacement of these components should be estimated and proposed under separate cover.3. Upon completion the contractor will calibrate and test the new scale deck.The contractor will be responsible for calibration and testing according to HB44 requirements. Certified weights and equipment shall be used and calibration documentation provided.4. Temporary scale installation and rental.It will be required that a temporary scale be installed to maintain operations while the scale deck replacement activities are being completed. The contractor will be required to ensure that a temporary scale deck meets required specifications to maintain operations, and is installed and operational prior to implementation of scale deck replacement activities. Online Q&A Yes Q&A Deadline July 10,2019 5:00PM (Eastern)

Bid Results

Municipal

$63,615.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
244
Bidding Soon
2,623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2019

August 15, 2019

Project location map

Hoffman Rd, Toledo, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.