Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 16, 2025 at 8:00 PM
Updated April 17, 2025
Site work and new construction of a playground / park / athletic field in Toledo, Ohio. Conceptual plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
The University of Toledo ("UToledo") is soliciting qualifications for professional Architect/Engineer ("A/E") Services associated with the relocation of baseball and softball to Main Campus along with a new/relocated intramural/club field. New baseball and softball ballparks are planned for the main campus to be located at the current Carter Field site. Recreational fields are planned to move directly adjacent to the new ballparks to a new turfed area, just to the west. The current throwing event area for track and field will be maintained at this site. A consolidated ballpark complex will create a whole new fan experience and bring greater efficiency to operations. Each ballpark will have its own bullpens, batting cages, dugouts, scoreboard, field lighting, and branded outfield fence. They will share amenities such as restrooms, concessions, gates, security fences, and a press box. Master Planning programming included the following spaces within the new complex: o New Competition Fields for Both Softball and Baseball o Turf infields and outfields o Seating for both sports o A shared press box serving both sports o Concession/Restrooms o Changing areas for home teams o Officials' rooms o Batting Cages o Bull Pens o New synthetic recreational fields Field metrics include: o Synthetic Turf infields and outfields for both fields. Baseball 335' down the left and right field lines, 400' center. o Softball 190' down the left and right field lines, 220' center. o Seating capacities for Baseball (650) and Softball (300). o New synthetic recreational fields will be created, opening up a number of outside event hosting opportunities, as well as creating a new practice field space for Football, band and intramurals. Conceptualization for this project was included in U Toledo's 2023 Athletic Facility Masterplan. Portions of this document will be shared with the short-listed firms (only) prior to interview and selection. EDGE Participation Goal Percent of initial Total A/E Fee: 5.0% Submit the Statements of Qualifications (Form F110-330) directly to Erin Buck at Erin.Buck@utoledo.edu with the project number included in the subject line. Submit all questions regarding this RFQ in writing to Nicole Baden at Nicole.Baden@utoledo.edu with the project number included in the subject line (no phone calls please). The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program and UToledo's Supplier Diversity Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services for each design and construction phase: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. The method of Contractor Selection has not been Determined at this time.
Conceptual
Playgrounds / Parks / Athletic Fields
$13,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
The University of Toledo - Main Campus, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Jul 16 2019
Toledo, OH
Bid Date: Dec 31 2025
Toledo, OH
Bid Date: Apr 22 2025
Toledo, OH
Bid Date: May 06 2025
Toledo, OH
Bid Date: Apr 29 2025
Toledo, OH
Bid Date: Apr 29 2025
Toledo, OH
Bid Date: Apr 29 2025
Toledo, OH
Bid Date: May 06 2025
Toledo, OH
Bid Date: Apr 22 2025
Toledo, OH
Bid Date: Apr 22 2025
Toledo, OH
Bid Date: Jun 23 2021
Toledo, OH
Bid Date: Apr 28 2025
Toledo, OH
Bid Date: Apr 28 2025
Toledo, OH
Bid Date: Apr 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
