Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 8, 2022 at 8:00 PM
Updated September 15, 2023
Site work, paving and renovation of a bridge / tunnel in Toronto, Ontario. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Work in this contract generally comprises the rehabilitation of the Mill Street Bridge over the West Don River. The work includes, but is not limited to the following major items: Traffic control for the duration of construction; Protection of public, vehicular and pedestrian traffic, site personnel, existing utilities, surrounding environment and properties, etc; Installation of temporary protection system; Removal of existing asphalt and waterproofing system on bridge deck; Removal of existing hand railings and concrete end walls; Removal of existing sidewalks on bridge deck; Scarifying and removal of deteriorated concrete from deck top surface; Removal of existing deck diaphragms; Removal of existing approach slabs; Removal of ballast walls and top portion of abutment walls and wingwalls; Removal of deteriorated concrete on the existing abutment walls, wingwalls and girders; Replacement of bearings; Concrete patch repair to deck soffit, abutment walls, wingwalls and girders; Convert existing abutment walls to semi-integral abutments; Placement of concrete overlay on scarified deck; Construction of new concrete deck extensions; Construction of new approach slabs; Construction of new concrete sidewalks on deck and approach slab; Construction of new parapet walls with railings; Placement of new asphalt and waterproofing; Installing temporary flow passage system at bridge. Carrying out condition survey of channel liner, design and repair concrete channel liner (Provisional). Construction of new concrete sidewalks on grade; Modification of catch basins and manholes to match new pavement elevation; Placement of new 90 mm asphalt and waterproofing system; Construction of new curb and gutters on approaches; and Construction of new steel beam guiderails. TIMELINE: Construction is complete. Coverage of this report is discontinued.
Under Construction
Bridges / Tunnels
$3,000,000.00
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2021
Mill St, Toronto, ON
Related To This Project
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Jun 28 2019
Toronto, ON
--
Toronto, ON
Bid Date: Jul 06 2020
Toronto, ON
Bid Date: Jun 15 2021
Toronto, ON
Bid Date: May 31 2022
Toronto, ON
Bid Date: Nov 18 2021
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Aug 23 2022
Toronto, ON
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
