Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2019 at 8:00 PM
Updated January 26, 2024
Site work and new construction of a residential development in Boston, Massachusetts. Completed plans call for the construction of a residential development; and for site work for a residential development.
Reinforced Concrete wall construction, including, excavation, backfilling, grading and paving of impacted area. a.The contractor shall excavate the area where the concrete wall to be erected, to the depth and size as shown in the attached plans. The location of the wall is approximately as shown in the attached map. The exact location of the wall will be determined on the site by the Superintendent of Buildings and Bridges. The area in question will be pointed out to the contractors during the mandatory site viewing. b. The contractor shall excavate the mentioned area to at least3'6" in depth and he/she shall remove move the excavated material and relocate it along the outside North wall of the salt shed. The contractor shall ramp the excavated material along the wall and he/she shall follow the Superintendent of Buildings and Bridges instructions while grading the excavated material against the mentioned shed wall. c. The Contractor shall prepare the excavated area, and spread 1" crushed stone, as shown in the plans. d. Once the Superintendent has approved the surface preparation after the area was excavated, the contractor shall start forming the foundation to receive the concrete. Prior to concrete delivered to the site, the Superintendent must first inspect and approve the rebar. e. Once the concrete wall is erected, he/she shall restore the area to its original condition, by backfilling, and spreading 8" of gravel below the asphalt pavement. The contractor must compact the gravel before laying the asphalt. f. While doing the work, the Contractor must follow any and all regulations, rules, protocols and standards in effect, City, State or Federal. g. The contractor shall obtain the necessary permits to do the work, from any agency having jurisdiction over the project. The contractor shall employ qualified and licensed (or whatever is required by any agency having jurisdiction over the project) repairmen/women to do the work. h. The contractor shall provide any and all tools, equipment and material necessary to do the work. i. The contractor may not interrupt the yards' operation. j. The contractor price shall be a lump sum for all that is described herein. k. The Contractors' price shall be based on the prevailing wage rates. l. The Contractor must carry workman's compensation. m. The contractor shall bring the job into completion by June 30, 2019.
Post-Bid
Residential Subdivision
$200,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2019
July 8, 2019
359 E Eagle St, Boston, MA
Related To This Project
Boston, MA
Bid Date: Jun 11 2019
Boston, MA
Bid Date: Jun 12 2019
Boston, MA
Bid Date: Jun 11 2019
Boston, MA
Bid Date: Jun 19 2019
Boston, MA
Bid Date: May 30 2019
Boston, MA
Bid Date: Jun 06 2019
Boston, MA
Bid Date: Jun 06 2019
Boston, MA
Bid Date: May 16 2019
Boston, MA
Bid Date: Jul 17 2019
Boston, MA
Bid Date: Jun 18 2019
Boston, MA
Bid Date: Aug 05 2019
Boston, MA
Bid Date: Jul 31 2019
Boston, MA
Bid Date: Jun 25 2019
Boston, MA
Bid Date: Aug 22 2019
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
