Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Boone, Iowa. Completed plans call for the construction of a office development; pre-engineered storage facility; for site work for a office development; and office development.
The Bid shall be awarded to the lowest responsive, responsible bidder meeting the project specifications. However, the Owner reserves the right to reject any or all bids, or any part thereof, and to waive informalities, and to enter into such contract deemed to be in the best interests of the United Community School District. The Project shall be known as the Transportation Building, United Community School District. The project includes, but is not limited to construction of a new 60' x 120' pre-engineered metal building or preengineered wood building to serve the school districts transportation department. The building shall be equipped with eight (8) bus storage bays, an office, and a single stall restroom. Substantial Completion of the Project shall be January 1, 2020 and Final Completion of all punch list items by , January 24, 2020. Bid Security in the amount of 5% of the bid in the form of a Bid Bond on form AIA A310, cashier check, certified share draft or certified check drawn on an Iowa bank or credit union chartered under the laws of the United States shall accompany each bid in a separate, sealed envelope. Bid Security shall be payable to United Community School District. Sales or use tax shall not be included in the bid. Pursuant to Iowa Code, at the time a Construction Contract is issued, the Owner will also issue an Exemption Authorization Letter and a Designated Exemption Entity, Iowa Construction Sales Tax Exemption Certificate for the purchase or use of building materials, supplies and equipment that will be used in the performance of the Work. Other requirements with respect to this provision are set forth in the Project Manual. By virtue of statutory authority, a preference will be given to products and provisions grown, and coal produced within the State of Iowa, and preference will also be given to Iowa domestic labor in the construction of said improvements. Upon award of a contract, the successful Contractor will be required to furnish a Performance and Payment Bond equal to 100% of the awarded Contract amount, and within the time set forth within the Contract Documents. The Contractor shall also furnish a copy of its Certificate(s) of Insurance showing coverage is being provided consistent with that stated within the Project Manual. The Project shall be paid for in cash or in warrants drawn on such funds as may be legally used for such purposes and available to the Owner. Final payment to the Contractor shall be made as allowed by the Code of Iowa.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$889,700.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2019
July 18, 2019
To Be Determined, Boone, IA
Related To This Project
Boone, IA
Bid Date: Feb 26 2020
Boone, IA
--
Boone, IA
Bid Date: Oct 27 2023
Boone, IA
Bid Date: Feb 20 2024
Boone, IA
Bid Date: Feb 15 2024
Boone, IA
Bid Date: Mar 22 2024
Boone, IA
Bid Date: May 01 2024
Boone, IA
Bid Date: Oct 12 2021
Boone, IA
Bid Date: Jul 19 2022
Boone, IA
Bid Date: Dec 07 2021
Boone, IA
Bid Date: Mar 16 2022
Boone, IA
Bid Date: Feb 15 2022
Boone, IA
Bid Date: Jan 19 2022
Boone, IA
Bid Date: Mar 06 2019
Boone, IA
Bid Date: Sep 22 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.