Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Birmingham, Alabama. Completed plans call for the renovation of a playground / park / athletic field.
Norwood Park Pool Building and Playground Renovations. All bids must be on a lump sum basis. Bids are to be submitted in duplicate on the Proposal Form provided with specifications. No pre-qualification of bidders will be conducted prior to receiving bids. Under the Alabama State Code, Section 39-2-4, as amended by Act #2017-279, it is required for any contract exceeding $50,000 that the Bidder submit with his bid, either a cashier's check, drawn on an Alabama bank, or a bid bond, executed by a surety authorized and qualified to make bonds in Alabama, payable to the City of Birmingham, in an amount (subject to a maximum of $10,000.00) equal to five percent (5%) of the bid. In order for a bid to be considered, it must be accompanied by an acceptable bid bond or cashier's check. Any bid submitted for an amount of $50,000 or more, the bidder must be a licensed general contractor in the State of Alabama in accordance with Section 34-8, of the Alabama State Code. Contractor's license number shall appear on the outside of the envelope used to submit bid. A Performance Bond in the amount of 100% of the contract amount and a Statutory Labor and Material Payment Bond in the amount of 100% of the contract amount will be required from the successful bidder at the signing of the contract. Also, proof of insurance will be required when the contract is signed. The City will review bonds and insurance and execute the contract within twenty (20) days unless the successful contractor agrees to an extension in writing. Since award may not be made within thirty (30) days, no bid may be withdrawn for a period of sixty (60) days after the date of the bid opening. The City reserves the right to reject any or all bids submitted, and to waive any informalities. Bidders are expected to prepare their bid to include all necessary material, labor, bonds, permits, overhead, profit, taxes, insurance, etc. costs. It is not the Citys obligation to bring mistakes/omissions in bid to bidder's attention. If after bid opening, a bidder determines he has a mistake in bid, he may seek withdrawal of his bid without forfeiting his bond, if the request is in writing within three (3) work days after the bid opening, and is accompanied by clear and convincing evidence of the mistake. All cashiers checks or bid bonds will be returned immediately after bids are checked and tabulated to all except the three (3) lowest bona fide bidders. Bid bonds shall be returned to the three (3) lowest bona fide bidders when the contract is signed and performance and payment bonds and insurance are furnished by the successful bidder. If award is not made within fifteen (15) days after bid opening, all bid guarantees will be returned except for those of the potentially successful bidders. If after sixty (60) days, no award has been made, all bids shall be rejected and the potentially successful bidder's guarantee will be returned unless the bidder agrees in writing to a time extension. If a time extension is effected, bidder may substitute any cashiers check for a satisfactory bid bond.
Bid Results
Playgrounds / Parks / Athletic Fields
$31,840.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2019
July 18, 2019
To Be Determined, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: May 24 2019
Birmingham, AL
Bid Date: Mar 16 2022
Birmingham, AL
Bid Date: Apr 14 2022
Birmingham, AL
Bid Date: Apr 11 2022
Birmingham, AL
Bid Date: Mar 17 2022
Birmingham, AL
Bid Date: May 23 2022
Birmingham, AL
Bid Date: May 12 2022
Birmingham, AL
Bid Date: May 12 2022
Birmingham, AL
Bid Date: Sep 11 2018
Birmingham, AL
Bid Date: May 04 2022
Birmingham, AL
Bid Date: May 05 2022
Birmingham, AL
Bid Date: May 05 2022
Birmingham, AL
--
Birmingham, AL
--
Birmingham, AL
Bid Date: Dec 08 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.