BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2019 at 8:00 PM

Updated March 14, 2026

Site work and paving for a mixed-use development in Herriman, Utah. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Midas Creek East Trail Connector is new construction and will require clearing, excavation, and installation of the following improvements: a new paved pedestrian trail, a new RAP equestrian trail both approximately 1/2 a mile in length, new concrete sidewalk, rockery retaining wall, and the installation of 3 precast bridges along with the corresponding concrete bridge supports/abutments. It also includes the demolition of an existing asphalt trail. Contractor shall provide all permits, materials, and labor to complete the project as designed.

Award

Roads / Highways

$559,953.00

Public - City

Paving, Site Work

27

12

17

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
93
Bidding Soon
939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2019

September 30, 2019

Project location map

Midas Creek Trail, Herriman, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.