BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in East York, Ontario. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

- Crescent Town Pedestrian Bridge Structural Rehabilitation. - The Project bridge spans Victoria Park Avenue at approximately 777 Victoria Park Avenue joining Dentonia Park and TTC Victoria Park Station in Ward 20. - Work in this Contract generally consists of the structural rehabilitation of Crescent Town Pedestrian Bridge. The work shall include but not be limited to the following: - Supply, installation, maintenance and removal of all traffic control components (signs, barricades, fences, barriers, delineators, pavement markings, flaggers, crash trucks etc.) to accommodate safe passage of vehicular and pedestrian traffic during all construction stages. - Supply, installation, maintenance and removal of all hoarding required to access the work area and separate the work area from the open pedestrian areas of the bridge. - Installation of tree protection and removal of trees. - Jacking of bridge superstructure. - Replacement of bridge bearings. - Protection of surface mounted conduits. - Removal of deteriorated concrete at bridge piers, deck, roof, girders, mullions, and abutments. - Concrete repair of bridge piers, deck, roof, girders, mullions, and abutments. - Refacing of pier caps including cathodic protection. - Replacement of expansion joints in deck. - Installation of new rooftop expansion joint covers. - Modification of existing roof beams and installation of new roof guardrail. - Replacement of west entrance pavers with concrete overlay. - Cleaning of roof deck drains. - Removal of existing roof waterproofind. - Application of new torch-applied 2-ply SBS modified bituminous roofing system. - Application of concrete sealer. - Application of non-slip floor coating. - Installation of louvers. The portion of the work that does not require access via the Hydro One Right-of-Way, including all work within the bridge and below the bridge, including all site restorations, clean up, and rectification of all known deficiencies, must be completed within 21 calendar weeks and by no later than December 31, 2019. The portion of the work requiring access via the Hydro One Right-of-Way, including all work on the roof of the bridge and work at the south face of the bridge within the Hydro One Right-of-Way including all site restorations, clean up, and rectification of all known deficiencies, must be completed by July 31, 2020. If the City obtains the Easement Agreement with Hydro One and notifies the Contractor prior to November 1, 2019, the 2020 construction season will be cancelled and the entire Contract, including all site restorations, clean up, and rectification of all known deficiencies must be completed no later than December 31, 2019. Documents and addenda may be obtained at: https://tinyurl.com/y65u2mox Owner does not track plan takers and/or interested bidders. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff

Award

Bridges / Tunnels

$2,650,003.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
246
Bidding Soon
4,529
All Active Projects
1,767
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 5, 2019

August 6, 2019

August 4, 2020

img_map_placeholder

Victoria Park Ave, East York, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.