BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Site work and paving for a road / highway in North York, Ontario. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Construction of a new grade-separated crossing of the Canadian Pacific Rail (CPR) corridor providing pedestrians and cyclists a connection to the Don Mills Trail from the Wynford Green Drive extension. The bridge will connect people walking and cycling between the Don Mills Trails north of the rail corridor to the proposed community and ravine and trail system to the south. The structure includes: 6.1 metre wide open-air bridge for pedestrians and cyclists, Steel I-girder structure, Accessible elevated ramps, an additional staircase connecting the bridge for more direct travel to Street C. TIMELINE: Consultant has completed the Don Mills Crossing Trail Bridge Municipal Class Environmental Assessment (EA) to identify a recommended plan for a new pedestrian and cyclist bridge crossing the Canadian Pacific rail corridor to connect the existing Don Mills trail to the Wynford Drive extension. Environmental Study Report has been completed approved. Project will be covered at time of tender. Coverage of this report has been discontinued.

Project Abandoned

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
189
Bidding Soon
5,064
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

Project location map

Don Mills Trail, North York, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.