BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2019 at 8:00 PM

Updated March 17, 2026

Site work, paving and renovation of a civil project in Superior, Arizona. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Tracs No 060 PN 226 F0165 01C Proj No NHPP-060-D(219)T Termini Phoenix - Globe Highway (US 60) Location (Superior - Gila County Line) Route No. Milepost District Item No. US 60 226.74 to 236.20 Southeast 9118 The proposed project is located in Pinal County within the Tonto National Forest, on US 60 near town of Superior, beginning at MP 226.74 and extending east along US 60 to MP 236.20. The work consists of pavement rehabilitation. The work includes milling and repaving, bridge deck rehabilitation; guardrails, signing, pavement marking, rumble strips, shoulder build-up, seeding and other related work. The time allowed for the completion of the work included in this project will be 205 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 6.62. To submit a valid bid, the bidder must (1) have prequalification from the Department as necessary for the project, and (2) be included on the project Plansholder List as a Prime. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. This project requires electronic bidding. If a request for approval to bid as a Prime Contractor is received less than 48 hours prior to bid opening, the Department cannot guarantee the request will be acted on. This contract is subject to the provisions of Arizona Revised Statutes Section 42-5075 -- Prime contracting classification; exemptions; definitions. No award will be made to any contractor who is not a duly licensed contractor in accordance with Arizona Revised Statutes 32-1101 through 32-1170.03. All labor employed on this project shall be paid in accordance with the minimum wage rates shown in the General Wage Decision. These rates have been determined in accordance with the requirements of the law and issued by the Secretary of Labor for this project. The wage scale is on file in Contracts and Specifications Section and copies may be obtained at all reasonable times. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. Questions and comments concerning the bid package for this project shall be directed to the individuals noted below: Engineering Specialist: Vian Rashid VRashid@azdot.gov Construction Supervisor: Chris Olson Colson.Consultant@azdot.gov AZDOT - Phoenix - Globe Highway (US 60) (Superior - Gila County Line)

Award

Bridges / Tunnels

$8,146,153.00

Public - State/Provincial

Paving, Renovation, Site Work

112

1

12

13

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
0
Bidding Soon
623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2019

October 8, 2019

Project location map

US-60, Superior, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.