BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2019 at 8:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Fillmore, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Pavement widening of Sespe Street to accommodate Class II bike lane on the west side & Class III bike lane on the east side of the same road, & pavement resurfacing & striping of Pasadena Avenue to accommodate Class III bike lanes. This work includes RCB extension with headwalls, RCP replacement, PCC driveway approach reconstruction, road shoulder slope & ditch regrading, air placed concrete, surface preparation & crack sealing, AC pavement widening, miscellaneous AC paving, Type II emulsion-aggregate slurry, PMB shoulder backing, pavement delineation & striping, sharrow markings, regulatory & warning signs installation, mailboxes replacement, & appurtenant work Pre-Qualification for Bidders: Not Required License Type Required: A DBE Goal Percentage: 10% Project Duration: 35 Work Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% MBE Utilization goal : 21.5% WBE Utilization goal : 6.9%

Award

Roads / Highways

$720,802.00

Public - County

Paving, Site Work

10

10

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1,444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2019

August 22, 2019

Project location map

Pasadena Ave & Sespe St, Fillmore, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.