BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2019 at 8:00 PM

Updated April 23, 2025

Site work and renovation of a residential development in Big Pine Key, Florida. Completed plans call for the renovation of a residential development; and for site work for a residential development.

The Scope of Work shall include, but not be limited to, a design build project. The Contractor is required to provide a complete job as contemplated by the drawings and specifications, which are a part of this bid package. The Contractor shall furnish all labor, supervision, materials, power, tools, equipment, supplies, permits and any other means of construction necessary or proper for performing and completing the Scope of Work, unless otherwise specifically stated. The Repairs to the individual property should follow damage descriptions according to damages sustained by Hurricane Irma. All repairs to be completed will be repaired Like-for-Like (IN-KIND) to specifications and conditions before Hurricane Irma. If the Like-for-Like repairs do not meet current Monroe County building code, the repairs must be improved to meet current county building code. Each item listed below is the captured visible damage, but when necessary repairs may need extended surface coverage to make a uniform repair or replacement. Repairs will include a complete livable space, with a fully functional home and utilities. Contractor must verify all measurements. This scope of work is to include but not be limited to the design and construction of: - Mold Remediation - Demolition of interior space and finishes. - Interior build out to match the pre-storm conditions including but not limited to the replacement of: o All Flooring o All Drywall o All Interior Doors o All Door Hardware o All Cabinetry o All Trim Work o All Restrooms with corresponding fixtures and accessories - Engineering and installation of a code compliant HVAC system. - Engineering and installation of a code compliant electrical system. - Remove and replace the roofing system including, overhangs and soffits Insulate the home per general practices. - Exterior work shall be done to bring the exterior up to pre-storm conditions shall include but not be limited to: o Stucco Finishes o All decking and decking support and railings including painted surface o Exterior Stairs and railings including painted surfaces o Painted Surfaces o Guttering, Down spouts, and fittings o Exterior lighting o Exterior Aggregate rock fill+ All bids must remain valid for a period of ninety (90) days. The Board will automatically reject the bid of any person or affiliate who appears on the convicted vendor list prepared by the Department of General Services, State of Florida, under Sec. 287.133(3)(d), FS (1997). All bids/proposals, including the recommendation of the County Administrator and the requesting Department Head, will be presented to the Board of County Commissioners of Monroe County, Florida, for final awarding or otherwise. The Board reserves the right to reject any and all bids, to waive informalities in any or all bids/proposals, and to readvertise for bids/proposals; and to separately accept or reject any item or items of bid and to award and/or negotiate a contract in the best interest of the County.

Bid Results

Residential Subdivision

$284,500.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
16
Bidding Soon
218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2019

September 23, 2019

Project location map

30150 South St, Big Pine Key, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.