BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 5, 2019 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Dorset, Ontario. Completed plans call for site work for a bridge / tunnel.

To repair the existing corrugated steel pipe (CSP) culvert at the Leslie M Frost Natural Resource Centre between July 15, 2019 and March 20, 2020. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff.

Post-Bid

Bridges / Tunnels

$100,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
32
Bidding Soon
642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2019

July 17, 2019

Project location map

20130 ON-35, Dorset, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.