BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a transportation facility in Fullerton, California. Conceptual plans call for the construction of a 7,950-square-foot, two-story above grade transportation facility; and for site work for a transportation facility.

Per the owner, as of January 12, 2024, this project has been cancelled. Closed solicitation has been included below for reference. ,,,,,,,,,,,,,,, The City of Fullerton is requesting proposals from qualified environmental consulting firms for the preparation of a negative/mitigated negative declaration for the construction of a new 7,950 square foot, two story building with associated site and parking lot modifications. The project site is within the existing Fullerton Airport complex with the new building located to the west of the existing terminal/control tower building. The scope of work will include the completion of an Initial Study, preparation of a Negative/Mitigated Negative Declaration, required technical studies and attendance at public hearings. The City of Fullerton is planning to construct a new 7,950 square foot, two story building with associated site and parking lot modifications. As referenced, the project is located within the existing airport site. The new building is intended to provide office space on the ground floor and a multi-purpose room on the second floor which will be available for rental. The airport site is zoned as Public Land. The project will not require a zone change however the proposed structure was not considered in the existing Fullerton Airport Master Plan, which will also need to be amended as part of this project. The City reserves the right to reject and replace any and all subcontractors, and reserves the right to approve all subcontractors. Questions pertaining to this RFP shall be submitted by email. Responses to questions timely submitted will be answered within two (2) working days by addendum posted on the City The City reserves the right of reject any or all proposals, to waive any informalities or minor irregularities in proposals received, and to be the sole judge of the value and merit of the proposals offered. The City reserves the right to withdraw or cancel this Request for Proposals at any time without prior notice and the City makes no representations that any contract will be awarded to any Consultant responding to the Request for Proposal. Any material misrepresentation made by the Consultant will void the proposal response and eliminate the Consultant from further consideration. The City reserves the right to delay scheduled dates if it is to the advantage of the City. The master copy of each proposal shall be retained for official files and will become subject to the Public Records Act. For questions related to this RFP, please contact David Grantham, Senior Civil Engineer at (714) 738-6853 or via e-mail at DGrantham@cityoffullerton.com The method of contractor selection has not been determined at this time

Project Abandoned

Transportation Terminals

$500,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
109
Bidding Soon
2,316
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2024

img_map_placeholder

4011 W Commonwealth Ave, Fullerton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.