BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2024 at 7:00 PM

Updated April 4, 2024

Site work for a water / sewer project in Fullerton, California. Completed plans call for site work for a water / sewer project.

Hollydale Area Water Main Replacement. The Work shall consist of, but not limited to, abandoning existing water main piping and appurtenances, furnishing and installing new water main piping and appurtenances, installation of pressure reducing vault assembly, installing and removing temporary bypass system, repair of the trench and asphalt, adjustment of water valve boxes, traffic control, water pollution control, and all related work. Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on The time of completion of contract shall be seventy-five (75) working days as defined in the Standard Specifications for Public Works, 2021 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $1,500 per calendar day. this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2021. The City Council reserves the right to reject any and all bids, to waive any informality or irregularity in the bidding, and to accept any bid when it is to the advantage and best interest of the City to do so, by order of the City Council of the City of Fullerton. Any questions regarding this bid package may be referred to Gar Huang, Public Works Department Engineering Division at 714.738.6895.

Award

Water / Sewer

$1,728,100.00

Public - City

Site Work

7

6

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
635
Active Projects
283
Bidding Soon
3,550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 15, 2024

Project location map

Multiple Locations, Fullerton, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.