BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, outdoor lighting and renovation of a mixed-use development in Fullerton, California. Completed plans call for site work for a playground / park / athletic field; for the renovation of a swimming pool; swimming pool; and for outdoor lighting for a playground / park / athletic field.

the entire work as described below: The Work shall consist of, but not limited to, removing existing site lighting poles, demolition of existing light pole foundations, construction of new light pole foundations, furnishing and installing new light poles and fixtures, installation of new electrical systems, concrete hardscape removal and replacement, and all related work. Due to COVID-19 directives, City Hall is currently closed to the public. However, staff members will be present outside of City Hall starting at 1:30 p.m. and will remain onsite until after the bid opening is completed. It is highly recommended to arrive with sufficient time for bidders to be able to line up. Bidders coming to City Hall are required to wear appropriate face coverings per the Citys Municipal Code and shall keep a minimum six (6) feet of separation while waiting in line to submit and during the bid opening process per the current social distancing guidelines. Bidders wanting to utilize delivery services (USPS, UPS, FedEx, etc.) or wanting to drop off bids outside the specified time window should make arrangements with City of Fullerton staff in advance. No Bid will be accepted unless it is made on a Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. The time of completion of contract shall be twenty (20) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $500 per calendar day.The Engineer's estimate for this project is $200,000. January 5, 2021 Award of Contract to Lowest Responsible Bidder,January 26, 2021 Deadline for Contractor to submit agreement, bonds, insurance documents, Water Pollution Control Documents, February 3, 2021 Preconstruction Meeting. The Contractor agrees to commence the work and related services upon the receipt of a written Notice to Proceed from the City. It is the Contractor's responsibility to provide sufficient and qualified personnel, equipment and materials. Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction.For help accessing and ordering, please contact an ARC Planwell Administrator at 949.660.1150.

Award

Swimming Pools

$179,333.00

Public - City

Outdoor Lighting, Renovation, Site Work

11

8

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
108
Bidding Soon
2,314
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2020

February 8, 2021

img_map_placeholder

801 W Valencia Dr, Fullerton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.