BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fullerton, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Due to COVID-19 directives, City Hall is currently closed to the public. However, staff members will be present outside of City Hall starting at 1:30 p.m. and will remain onsite until after the bid opening is completed.It is highly recommended to arrive with sufficient time for bidders to be able to line up. Bidders coming to City Hall are required to wear appropriate face coverings per the City's Municipal Code and shall keep a minimum six (6) feet of separation while waiting in line to submit and during the bid opening process per the current social distancing guidelines. No Bid will be accepted unless it is made on a Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contrac In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2018 The Work shall consist of, but not limited to, cold milling pavement, asphalt concrete overlay, removing and constructing concrete hardscape, removing and constructing curb ramps, curb and gutter, sidewalk, driveways, alley return, adjusting manhole and water valves to grade, traffic control, signage and striping, water pollution control, and all related work. Liquidated Damages shall be $3,500 per calendar day The City intends to issue a Notice to Proceed on or before April 5, 2021. Contractor will take full responsibility for completing all precursory requirements necessary for this issuance. Contractor shall take note of the following dates and milestones: March 2, 2021Award of Contract to Lowest Responsible Bidder. March 23, 2021Contractor to submit agreement, bonds, insurance documents, Water Pollution Control Documents. March 30, 2021Preconstruction Meeting. April 5, 2021 Notice to Proceed/Start Construction The City Council reserves the right to reject any and all bids, to waive any informality in the bidding, and to accept any bid or portion thereof, by order of the City Council of the City of Fullerton. Any questions regarding this bid package may be referred to Nick Esposito, Public Works Department Engineering Division.

Award

Roads / Highways

$605,236.00

Public - City

Paving, Site Work

9

8

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
103
Bidding Soon
2,306
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2021

April 5, 2021

img_map_placeholder

W Orangethorpe Ave, Fullerton, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.