Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation and addition to an educational facility in Fullerton, California. Working plans call for the renovation of a educational facility; and for the addition of a educational facility.
This project will renovate the existing Engineering and Computer Science buildings (#10, 10A) and demolish the single-story engineering buildings (10B, 10C, 10D, 10E). The renovations will upgrade the building envelope, including windows and roofs. It will also address restroom accessibility and building fire/life safety and heating and cooling systems. The project will correct functional, building code, and programmatic deficiencies and extend the service life of a 50-year-old building complex. All aspects of the buildings will be improved as needed to support the program needs and student success for another 50 years. This project is included in the California State University's FY 2024/2025 to 2028/2029 CIP. Per the owner, as of October 17, 2024, an architect and a general contractor have been selected. The owner states that the project is in design. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Pre-Construction/Negotiated
Educational
$122,686,000.00
Public - State/Provincial
Addition, Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
800 N State College Blvd, Fullerton, CA
Related To This Project
Fullerton, CA
Bid Date: Feb 20 2024
Fullerton, CA
Bid Date: Jan 25 2024
Fullerton, CA
Bid Date: Feb 20 2024
Fullerton, CA
Bid Date: Feb 15 2024
Fullerton, CA
--
Fullerton, CA
Bid Date: Feb 13 2024
Fullerton, CA
Bid Date: Sep 26 2019
Fullerton, CA
Bid Date: Feb 21 2024
Fullerton, CA
Bid Date: Jan 18 2024
Fullerton, CA
Bid Date: Dec 20 2023
Fullerton, CA
Bid Date: Jun 30 2020
Fullerton, CA
Bid Date: Jan 03 2024
Fullerton, CA
Bid Date: Jan 03 2024
Fullerton, CA
Bid Date: Dec 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.