BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in San Rafael, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

Location and Description: The Project is located at Third Street from Union Street to Second Street and along Second Street from Marquard Avenue to Shaver Street, including portions of Ida Street, G Street, Ritter Street, Miramar Avenue, and Miraflores Avenue as indicated in the plans. All work is within the public right of way excepting portions of a new sewer main and laterals in the Miramar and Miraflores residential community. The project is a multi-agency improvement project that includes the City of San Rafael, the San Rafael Sanitation District, and the Marin Municipal Water District. Project improvements consist of all associated work described in the attached plans, specifications and the provisions of this document and generally described as follows: City of San Rafael : Project improvements include removal of existing asphalt pavement sections, ramps, sidewalk, curb, gutter, catch basins, striping, traffic signals, underground utilities and installation of new asphalt pavement, asphalt dig-outs, ADA compliant ramps, sidewalk, curb, gutter, signing and marking, storm drain system, traffic signal systems, lighting, fiber optics, coordination with utility agencies for relocation of their facilities, potholing, and striping for the roadway as indicated in the plans. San Rafael Sanitation District: Project improvements include removal and replacement of existing facilities, traffic control, utility location, potholing, utility and neighbor coordination as necessary for installation of sanitary sewer facilities within public right-of-way and/or easement areas. Marin Municipal Water District: The work to be done includes, but is not limited to, the following: removal and replacement of existing facilities, traffic control, utility location, potholing, utility and neighbor coordination as necessary for installation of approximately 6,570 feet of 8, 6, and 4 inch welded steel, 8-inch fusible PVC carrier pipe in 14-inch welded steel casing and 2-inch copper pipe with valves, fittings and appurtenances. If you have any questions or need information clarified, please contact the City of San Rafael Department of Public Works at 111 Morphew Street, San Rafael, CA 94901; Phone (415) 485-3355.

Bid Results

Roads / Highways

$18,248,708.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
49
Bidding Soon
1,728
All Active Projects
737
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

February 21, 2022

img_map_placeholder

3rd St, San Rafael, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.