BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in College Station, Texas. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; pre-engineered storage facility; and pre-engineered storage facility.

Carter Creek Wastewater Treatment Plant Equipment Building The City of College Station is seeking a construction company with quality experience in site preparation, construction of pre-engineered steel metal building, construction of an enclosed vehicle wash rack with drainage system, concrete flat work, drainage improvements, and associated infrastructure. This project includes the construction of a3-sided pre-engineered metal building with an adjacent enclosed vehicle wash rack with drainage system at the Carter Creek Wastewater Treatment Plant located at 2200 N. Forest Pkwy. The City has established $850,000.00 as the estimated construction budget for all the Work including alternates as described in the Drawings, Technical Specifications, and other Contract Documents prepared by the A/E. Questions and inquiries about this RFP should be submitted in writing via the Q&A feature available through the Brazos Valley e-Marketplace Bidding System The City has determined that 240 calendar days from the Notice to Proceed to Substantial Completion (and additional 30 to Final Completion) should be sufficient time for performing all work Payment greater than prevailing wage rate as listed within this document not prohibited per Texas Government Code, Chapter 2258, Prevailing Wage Rates, Subchapter A. General Provisions. The Contractor shall secure and pay for all necessary permits and licenses, governmental fees, and inspections necessary for the proper execution and completion of the Work Owner reserves the right to reject any and all proposals by reason of this request. The City reserves the right to consider historical information and facts, whether gained from the proposal, references, or any other source, in the evaluation process C0008-0037-00 Statement of Work: Removal of asphalt, removal of concrete, subgrade preparation and construction of concrete pavement. Construction to electrical and instrumentation components. Construction of fiber and illumination. Construction of non-potable waterline improvements. Construction of a vehicle wash rack equipment, with oil water separator and necessary sanitary sewer improvements. Coordination with City of College Station IT department. Coordination with City of College Station Water/Wastewater department. Coordination with A1 Pump, Inc for Fuel Island Perform work without interrupting other operations at treatment plant. Contractor shall coordinate all work, inspections, and approvals with the City of College Station. Project shall comply with the United States Occupational Safety & Health Administration regulations. Methods & Means of construction shall be compliant with all applicable Federal, State, and Local regulations. This includes obtaining all necessary permits and inspections. Contractor to adhere to City of College Station construction administration procedures. Maintain and submit all project records such as record drawings, project manuals, and warranties for approval by the City of College Station. Question Deadline 10/19/2023 at 2:00 PM CT Questions and inquiries about this RFP should be submitted in writing via Electronically. The following bid opportunity has been cancelled by the buyer.

Post-Bid

Water / Sewer

$850,000.00

Public - City

New Construction, Site Work

29

24

6

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
64
Bidding Soon
2,865
All Active Projects
1,089
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

img_map_placeholder

2200 N Forest Pkwy, College Station, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.