BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2019 at 8:00 PM

Updated November 1, 2024

Renovation of a medical facility in Webster, Texas. Completed plans call for the renovation of a 15-bed medical facility.

Interior renovation of existing space on the 8th floor of the operational Clear Lake Campus Hospital. Renovations to convert half this unoccupied existing hospital floor into a 15 bed Pediatric unit. Four of the rooms will be setup for pediatric intermediate care needs. Project scope includes modifications to create all the necessary support spaces, demo and rebuild of select areas, patch and paint of the entire scope area, addition of med-air to each patient room, additional med gas to the IMU rooms.

Post-Bid

Medical

$2,000,000.00

Public - State/Provincial

Renovation

1

5

14

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
193
Bidding Soon
3,414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2019

September 8, 2019

Project location map

200 Blossom St, Webster, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.