Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 14, 2019 at 8:00 PM
Updated July 30, 2025
Site work, paving and new construction of a mixed-use development in Farmington, Minnesota. Working plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; playground / park / athletic field; and for the construction of a playground / park / athletic field.
As of Aug 14,2019 project will go for rebid due to not enough bidder bid on the project and it's over the budget. **As of August 08, 2019 the bid received was reject and the project is being rebid later this fall. Project includes but, is not limited to, construction surveying and staking, on site earth work, topsoil fill, granular sand, silt fence, erosion control log and blanket, HDPE drain tile, precast concrete, water service, gas fireplace, bituminous paving, class 5 paving, trail construction, concrete surfacing, concrete curb, trap rock gravel paving, concrete stairs, stone stairs, outcrop walls, galvanized handrails, parking lot striping, drinking fountains/yard hydrant, seat walls, fire pits, shade structures, boardwalks, concrete abutments, vault toilets, 2 camper cabins, 1 warming shelter building, deck, site preparation, landscaping, site electrical, irrigation, and site grading to ensure proper storm water runoff. Bids must be submitted only on the bid form supplied in this RFB document. No oral, telegraphic or telephonic bids or modifications will be considered. Submit with each bid a certified check or acceptable bidder's bond payable to Dakota County in an amount equal to five percent (5%) of the total base bid. The successful bidder is required to furnish satisfactory Labor and Material Payment Bond and Performance Bond equal to 100% of the total contract amount. Bids may not be withdrawn within one hundred and twenty (120) days after the opening bids. The Dakota County Board of Commissioners will consider award of the project on August 6, 2019 and reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. Project budget is $3,100,000. Owners representative is Josh Kinney 952-891-7016 or 612-387-6260. The Owner requires Substantial Completion of the project by July 31, 2020. Project no- 19023
Final Planning
Sidewalks / Parking Lot
$3,100,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2019
February 14, 2020
17100 Station Trail, Farmington, MN
Related To This Project
Farmington, MN
Bid Date: Dec 18 2025
Farmington, MN
--
Farmington, MN
Bid Date: Dec 23 2025
Farmington, MN
Bid Date: Feb 10 2026
Farmington, MN
Bid Date: Feb 17 2026
Farmington, MN
Bid Date: Mar 24 2026
Farmington, MN
Bid Date: Aug 13 2025
Farmington, MN
Bid Date: Sep 12 2025
Farmington, MN
Bid Date: Sep 05 2025
Farmington, MN
Bid Date: Jul 29 2025
Farmington, MN
Bid Date: Jul 17 2025
Farmington, MN
--
Farmington, MN
Bid Date: Feb 17 2026
Farmington, MN
Bid Date: Jun 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
