BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2019 at 7:00 PM

Updated November 15, 2023

Site work for a playground / park / athletic field in Mukilteo, Washington. Completed plans call for site work for a playground / park / athletic field.

The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of Byers Family Park/ Peace Park. Specific work includes, but is not limited to, site clearing and grubbing, erosion control, removal of select fencing, import/export of fill materials, rough and fine grading, soil amendment with compost, topsoil installation, construction of a cement concrete plaza, concrete pier footings for future arbor installation, construction. of terraced rockery walls, fence replacement, lawn installation, sanitary sewer capping, and bike rack installation. The estimated cost for this project is in a range of $165,000 to $205,000. No pre-bid site inspection or meeting is scheduled. Please note the requirements of Section 1-02.4 of the WSDOT Standard Specifications. This project is expected to begin construction in May of 2020. This contract involves "public work''. 'Workers performing work in conjunction with the project shall receive the prevail-ing rate of wage pursuant to the Prevailing Wages on Public Works Act (Chapter 39.12 RCW) Bid Bond Required: Each bid shall be accompanied by a bid bond in the form of certified check, cashier's check or surety bond in an amount; equal to at least 5% of the amount of the Base Bid. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated. in the specifications, the bid bond shall be forfeited. to the City of Mukilteo. The City of Mukilteo reserves the right to reject any and all bids and to waive informalities and minor irregularities in the bidding documents. The City of Mukilteo is an equal opportunity employer and invites responsive bids from all qualified. responsible bidders. The City further reserves the right; to make the bid award as deemed in the best interest of the City. It is anticipated that this project will be funded in part by the Washington State Department of Commerce.

Award

Playgrounds / Parks / Athletic Fields

$116,671.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
114
Bidding Soon
1,832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2019

May 1, 2020

Project location map

To Be Determined, Mukilteo, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.