BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2021 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Mukilteo, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project consists of installing approximately 975 linear feet of 6-inch diameter IPS HDPE DR 9 force main using directional drilling from the existing meter vault at the Lift Station 5 site to 63rd Place West and 75 linear feet of 36-inch steel casing. The work will also consist of installing 25 linear feet of 8-inch PVC gravity sanitary sewer main, one manhole, one saddle manhole, general restoration, and asphalt overlay. The Work shall be substantially complete within 40 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the General Munager, District Office, Mukilteo, Washington. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "Mukilteo Water & Wastewater District" and in an amount of not less than five percent (5%) of the total Proposal amount. Due to limited parking availability and to encourage social distancing, please contact the Project Engineer at least 24 -hours in advance ofthe Prebid Walk Through and indicate your intention to attend. The event may be divided into groups if attendance is large. Financing of the Project has been provided by Mukilteo Water & Wastewater District and Public Works Board Construction Loan. The Mukilteo Water & Wastewater District expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.

Award

Water / Sewer

$638,463.00

Public - City

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
114
Bidding Soon
1,832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2020

January 15, 2021

Project location map

8926 61st Pl W, Mukilteo, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.