BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2020 at 8:00 PM

Updated July 22, 2025

Site work and new construction of a mixed-use development in Hines, Oregon. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and water / sewer project.

As of October 2020, project is bidding in two packages to subcontractors. Bid package 1 bid on September 22, 2020 and all trades are awarded and secured. Bid package #1 included earthwork, utilities, survey, concrete, special inspections, underground/underslab plumbing, and underground/underslab electrical pathways. Bid package 2 is currently out for bid, please see Emigrant Creek Interagency Fire Facility - Bid Package 2 for details. Construction is underway. *Contract Award Date: Jun 22, 2020 Contract Award Number: 1204M320C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 967464400 Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: GRIFFIN CONSTRUCTION, LLC Contractor Awarded Address: Prineville, OR USA Base and All Options Value (Total Contract Value): $4678542.00 The Emigrant Creek Ranger District compound is located on 7 acres in Hines, Oregon. As part of the site, there are two converted residences that serve as office space for the Burns Interagency Fire Zone. The intent of this project is to replace the existing converted residences with a 14,800 square foot premanufactured facility that may consist of one or more buildings. This includes site demolition of the existing fire offices, grading, drainage, utility connection, landscaping, and hardscaping. Estimated Price Range: $1,000,000 to $5,000,000. This is being Set-Aside 100% for Small Business in accordance with FAR 19.5. The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 9/30/2021. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 6/15/2020. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Under Construction

Warehouse / Distribution - Pre-Engineered Storage Building

$4,678,542.00

Public - Federal

New Construction, Site Work

9

37

2

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
14
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2020

September 28, 2020

Project location map

265 Hwy 20, Hines, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.