BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Marietta, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes, but is not limited to, the following major elements: 1. Project Overview a. Modernize the SCADA network and create a campus wide control system. b. Upgrade the 480VAC motor control systems at the Quarles Plant 2 Main Plant and the Raw Water Pump Stations. 2. Description of Work a. Existing Motor Control Centers (MCCs) in the Quarles Plant 2 will be replaced with intelligent MCCs that will provide remote start/stop controls and monitoring at the plant SCADA system via Ethernet. The new MCCs will also include arc flash hazard mitigation to reduce the incident energy resulting in a safe installation for plant personnel. b. Centralized UPS systems will be provided in several buildings. c. New raceways (conduits and cable trays) and wiring will be provided between process equipment/instrumentation and the new MCCs and LCPs. d. A new electrical building will be provided for the residuals area. New electrical rooms will also be provided in the Filters and Chemical buildings. e. New fiber optic ductbanks will be installed in portions of the site and new single-mode fiber optic cables will be installed in existing empty conduits. f. The replacement work will be sequenced as required and temporary power will be provided to keep the plant operational during construction. g. The existing treatment facility will be required to remain in service during construction. The time allowed for Substantial Completion is 995 consecutive calendar days, and the time allowed for final completion and readiness for final payment is 1,085 consecutive calendar days from the date of commencement. THE WORK will be awarded in one Contract. Only Bids including a pre-qualified Electrical Subcontractor will be considered for award of the Contract. All questions related to the Project shall be submitted by email no later than 5:00 p.m., local time, January 19, 2022 to David Haas at dhaas@hazenandsawyer.com. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the Owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the Owner in an amount equivalent to five percent of the total amount payable by the terms of the contract or, in lieu thereof, a certified check, cashier's check, or cash in equal amount. The Bid Bond shall be prepared on the Bid Bond form attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as Surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570. Each Bid must also be accompanied by a notarized Non-Collusion Affidavit of Bidder, Contractor's License Certification, Affidavit Verifying Status for Cobb County-Marietta Water Authority Public Benefit Application, and Security and Immigration Compliance Act Certification. Out-of-state corporations and other entities must submit evidence of authority to conduct business in Georgia as an out-of-state entity. Each Bidder must be licensed in the State of Georgia at the time of the Bid. Bids shall be submitted only under the legal name certified to transact business in Georgia by the Georgia Secretary of State. The successful Bidder will be required to furnish a Performance Bond, Payment Bond, Certification of Contractor's Attorney, and Contractor's Affidavit and Agreement with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The successful Bidder will also be required to furnish the Pre-Construction Oath pursuant to O.C.G.A. 36-91-21 from every person who procures the Agreement. The successful Bidder shall also provide an executed Subcontractor Affidavit for each subcontractor working on the Project, using the form attached to the Agreement; Subcontractor Affidavits shall be submitted to the Cobb County-Marietta Water Authority as each subcontractor is brought under contract during execution of the Project. The terms and time for payment are set forth in the Agreement. All Bids will remain subject to acceptance for sixty days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject all Bids, to waive informalities and re-advertise.

Award

Water / Sewer

$29,010,390.00

Public - County

Renovation, Site Work

302

38

40

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
54
Bidding Soon
1,498
All Active Projects
567
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

April 3, 2023

img_map_placeholder

4402 Lower Roswell Rd, Marietta, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.