Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a water / sewer project in Sterling, Colorado. Working plans call for the renovation of a water / sewer project.
As of July 19, 2022, this bid package has not went out for bid. The project is in the final planning phase. It is anticipated bidding will commence in December 2022. A firm timeline for start of construction has not been determined. Closed solicitation has been included below for reference. The City of Sterling is requesting written proposals from qualified firms to provide engineering services Architectural and Engineering Services for Final Design for the City of Sterling Wastewater System Improvements Project Proposers assume the risk of their method of delivery. All proposals shall be submitted in a sealed envelope marked, Architectural and Engineering Services for Final Design for the City of Sterling Wastewater System Improvements Project If mailed, said sealed proposal envelope shall be inserted in another envelope to bear necessary mailing information Proposal Envelope Shall Have the Following Information Affixed to It: on the Envelope Containing the Proposal, It is Imperative: 1. That It Be Addressed to: City of Sterling Director of Finance 421 N. 4th St. P.o. Box 4000 Sterling, Co 80751 2. That Your Proposers Name and Address Appear in the Upper Left Corner. 3. That the Following Information Be Included in the Lower Left Corner: Sealed Proposal Date of Opening _August 15, 2019 Time of Opening 2:00 PM (MDT) Proposal for: Architectural and Engineering Services for Final Design for the City of Sterling Wastewater System Improvements Project. The method of contractor selection has not been determined at this time The work for which SOQs are requested is generally described as the construction of improvements to the existing wastewater treatment facility and a new 3.0 million gallon per day wastewater treatment process. The Work will include, but is not necessarily limited to, the furnishing of labor, materials, equipment and installation for the construction of the following: 1. New fine screen and septage receiving equipment in a new building 2. New biological nutrient removal (BNR) system in new concrete tanks, with IFAS media 3. Two new circular 70-foot diameter secondary clarifiers in new concrete tanks 4. New return activated sludge (RAS) and waste activated sludge (WAS) pumping systems in a new building, new chemical storage building 5. Existing Blower building new electrical equipment, controls and roof 6. Existing Disinfection building improvements including new UV disinfection system, electrical equipment, roof and process changes 7. Improvements to control systems and communications 8. Site work including grading, drainage, gravel paving, yard piping and manholes 9. Membrane liner and return pumping system for a 30-million-gallon emergency storage pond 10. Appurtenance work 11. Bid Additive New Control Building with lab and new Garage 12. Bid Additive New UV and Filter Building The work has an anticipated construction cost of $15 million to $20 million. The project is being funded through the Colorado SRF Loan program *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Final Planning
Water / Sewer
$20,000,000.00
Public - City
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2021
January 17, 2023
Multiple Locations, Sterling, CO
Related To This Project
Sterling, CO
Bid Date: Apr 12 2023
Sterling, CO
Bid Date: Jul 29 2022
Sterling, CO
Bid Date: Oct 04 2022
Sterling, CO
Bid Date: Mar 04 2021
Sterling, CO
Bid Date: Feb 18 2021
Sterling, CO
Bid Date: Mar 16 2023
Sterling, CO
--
Sterling, CO
Bid Date: Apr 13 2022
Sterling, CO
Bid Date: May 18 2022
Sterling, CO
Bid Date: Nov 19 2023
Sterling, CO
Bid Date: May 18 2022
Sterling, CO
Bid Date: May 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.