BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work, new construction and renovation of a municipal facility in San Antonio, Texas. Conceptual plans call for the demolition of a municipal facility; for the construction of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

Estimated Cost: $27,500,000.00 July 31, 2019 by 2:00 p.m- Receipt of Written Questions Due Respondent may contact Jonathan Miranda, Contract Administrator via email at Jonathan.Miranda@saws.org The San Antonio Water System (SAWS) is soliciting statements of qualifications (SOQ) from interested Design-Build (DB) firms (Respondents) to design and construct one (1) new service center facility and the associated renovation and demolition of two other existing service center sites, as part of the Design-Build Phase III Service Center Project .These Operation Centers not only serve as office space for the field operations staff, but also function as dispatch centers for various types of work crews. This request for qualifications (RFQ) invites Respondents to submit a statement of qualifications describing in detail Respondent's technical and financial qualifications to act as the DB firm for the Project. SAWS has hired APSI Construction Management to serve as the Program Manager (PM) for this Project. The awarded DB firm will coordinate with SAWS and the PM to deliver the Project. Design and construction of the Project shall be completed using the design-build method of procurement in accordance with Section 2269.301 et seq. of the Texas Government Code. These related design and construction services shall require a scope of service to be performed by a single, qualified and independent DB firm. The successful DB firm, which will be determined following subsequent interviews of a maximum of five (5) respondents, will be chosen to interview and to submit proposals in response to SAWS' future issuance of a request for proposals (RFP). Selection of the successful DB firm will be determined based upon the proposal that SAWS determines to provide the best value to SAWS, according to the evaluation criteria for selection set forth below in Section II. C. of this RFQ.

Project Abandoned

Municipal

$27,500,000.00

Public - City

Demolition, LEED Certification, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
40
Bidding Soon
2,116
All Active Projects
736
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2019

April 27, 2020

img_map_placeholder

Multiple Locations, San Antonio, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.