BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2022 at 8:00 PM

Updated November 16, 2023

Site work, paving and new construction of a civil project in Columbus, Ohio. Completed plans call for paving for a road / highway.

This project will reconfigure the interchange of U.S. 33 and SR 161/Post Rd., including all ramps. Two new loop ramps will be added at the entrances to U.S. 33 to eliminate existing left-turn conflicts, and the exit ramps will be re-aligned to connect with Eiterman Rd. and Hyland-Croy Rd. As of September 16, 2022, the Demolition portion of U.S. 33 bridges began in June 2022. Hyland-Croy Road Improvements is in design. Construction is slated to begin March 2023 with completion date of December 2023. The final completion is scheduled for May 2024. sted.

Under Construction

Roads / Highways

$40,340,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
121
Bidding Soon
2,261
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

Project location map

Multiple Locations, Columbus, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.